REFUELING BLOCK POINT

Price
NEGOTIABLE
Availability
ON ORDER
Container stations, Block item repaired, with major repairs, Soviet-style.
1.Perelik work performed on ALD-8:
· Stripping tank;
· Flaw detection reservoir;
· Calibration tank geometric method;
· Install valve SMDK 50;
· Overhaul PRK;
· Repair shut-off valves;
· Replacement of facades.
2.Standartna equipment filling flow items:
· Fuel distributing column;
· Breathing valve SMDK 50;
· Pressure hose 10 m. And tap Dispenser 1 pc.
· Calibration table;
· Conclusion of the testing of the tank;
· Passport tank;
· Passport points filling block;
· Filter seperator.
1.Perelik work performed on ALD-8:
· Stripping tank;
· Flaw detection reservoir;
· Calibration tank geometric method;
· Install valve SMDK 50;
· Overhaul PRK;
· Repair shut-off valves;
· Replacement of facades.
2.Standartna equipment filling flow items:
· Fuel distributing column;
· Breathing valve SMDK 50;
· Pressure hose 10 m. And tap Dispenser 1 pc.
· Calibration table;
· Conclusion of the testing of the tank;
· Passport tank;
· Passport points filling block;
· Filter seperator.